Pause then resume was flaky: soft resume cleared lifecycle epochs so stale
paused events re-applied, soft failures always rehomed to dedicated-resume
(panel queue vanished, "reconnecting" then stuck paused), and concurrent
range soft-drain only waited 1.5s before "still finishing".
Soft resume now stamps bridge lifecycle epochs, only hard-reconnects when
the live stream is gone, dedicated resume reuses terminal/parked transports
(including ephemeral hosts), and deferred sparse settle runs in the
background with a longer resume wait for in-flight ranges.
Pause and resume now go through one process-level control plane that survives
panel/terminal close: TransferRuntime + soft latches/epochs/walk registry,
soft-then-hard resume, dual-epoch-safe progress, and no-owner soft control.
Make folder pause latch-first with barriers and a child pause watchdog so
workers stop claiming files after soft-drain; soft-resume live walks instead
of full rewalks. Surface path conflicts with toasts, keep pause progress
visible, and show a resume spinner. Restore verified shell rm -rf with SFTP
confirmation for fast directory delete, and prefer reconnect over wiping the
pane to the host picker when listing fails on some hosts.
Keep browse sessions independent of pool transfers, complete dedicated resume
for files/folders after restart, roll back partial pause safely, clamp crash
checkpoints to durable .part size, and open upload targets by connecting the
host when no terminal tab is active.